- On this screen, all the tasks for the detected violations during inspections are displayed in a consecutive list (Fig. 1). This task type is automatically generated by the system in case of a negative answer of the auditor.
- From the task list screen, you can go to the field with a detailed task description (Fig. 2).
Comments